Biscuit

BOAT:

Biscuit, a 1974 Cape Dory Typhoon

Project Detail:

Timeline:

Mid-October through TBD

Project Scope: Bottom job (stripped, barrier coat, and new antifoul), hull and deck paint, structural repairs, new brightwork fabrication, assembly and varnishing, mast and boom paint, new deck hardware, more tbd.

Biscuit.jpg

Project Hours:  

Aft Cockpit Trim & Coaming Boards Varnish

Aug 21, 2025

Two critical components remain to be fabricated for the brightwork: the taffrail and the aft cockpit trim. Today I tackled the aft cockpit trim. This trim piece is transverse between the coaming board, and on the aft-end of the cockpit. I placed the recently fabricated coaming boards into position, and using a small hydraulic jack, pushed them into their final position, as if screwed and secured to the fiberglass backing. I then used a combination of the old trim, new measurements, and aesthetics to determine the dimensions and overall geometry of the new piece.

Back in the shop I removed the trim piece, in rough form, from the blank mahogany, and then cleaned up the surfaces with both a router and human hand. At this point, I took the new trim back to biscuit and iterated through positioning and sanding until I had achieved desired fit. I placed the trim piece back in the shop to ruminate on the overall result...I may decide to change this piece a bit, but will be "on the house" so to speak. More to come I'm sure!

To finish out the session, I turned to the coaming boards themselves, solvent-wiped the surfaces and applied a thinned coat of varnish - the sealer coat.

Total Hrs: 3.5