Biscuit

BOAT:

Biscuit, a 1974 Cape Dory Typhoon

Project Detail:

Timeline:

Mid-October through TBD

Project Scope: Hull and deck paint, structural repairs, brightwork assembly and refinishing, other tbd

Biscuit.jpg

Project Hours:  

2nd Round Fairing - Aft Deck (3-31-24)

Mar 31, 2024

I set about today to apply the second round of fairing filler to the surface of the core repair on the aft deck. The day prior, I had sanded the aft deck (as well as the starboard side of the cockpit), but left the sanding of the repair area more or less untouched. I worked through the area with 80-grit sandpaper, periodically reviewing the surface with eyes and a straightedge to get a sense of progress. After a bit of sanding, and satisfied with the progress, I cleaned up the surface with a thorough vacuuming and a solvent wash. I then prepared a batch of epoxy, thickened with 407 low-density fairing filler and applied it with a wide knife. After the next sanding knockdown, I'll have a good sense of whether she requires another thin application of fairing compound.

Total Hrs: 1.75

Anchor 1
bottom of page