BOAT:
Biscuit, a 1974 Cape Dory Typhoon
Project Detail:
Timeline:
Mid-October through TBD
Project Scope: Bottom job (stripped, barrier coat, and new antifoul), hull and deck paint, structural repairs, new brightwork fabrication, assembly and varnishing, mast and boom paint, new deck hardware, more tbd.

Project Hours:
Bunging the Rails
Feb 8, 2026
With the rub rails and the toe rails recently undergoing final install, I decided to brings the rails closer to completion by bunging the fastener holes. I grabbed the small tub of bungs (cut from the same mahogany used in the fabrication of Biscuit's new brightwork) a small amount of varnish, some disposable shop gloves, and a hammer, and then headed over to Biscuit.
I wore a disposable glove on my left hand, dipped the individual bung in a bit of varnish to fully coat it, and then tapped the bung into position. I started at the starboard bow, applying bungs to the rub rail, and moved toward the aft. I then moved up to the toe rail and worked my way forward to complete the starboard side. I repeated this process on Biscuit's port rails. In the coming days, after the varnish fully cures, I will come back to trim the excess bung material and sand to a smooth surface prior to applying additional coats of varnish.
More brightwork in the coming days.
Total Hrs: 2.25