About Her:  Biscuit is a '74 Cape Dory Typhoon

Project Scope: Bottom job (stripped, barrier coat, and new antifoul), hull and deck paint, structural repairs, new brightwork fabrication, assembly and varnishing, mast and boom paint, new deck hardware, more tbd.

Timeline:  October '24 through TBD

Biscuit.jpg

Project Hours:  

Fairing Aft Deck Repair and Continued Interior Sanding (1-17-25)

Jan 17, 2025

With just a couple hours to work, I got straight to work on the aft deck repair. After removing the peel ply, I lightly sanded the surface and then applied a batch of fairing filler - West System epoxy resin thickened with 406 colloidal silica and 407 low-density fairing filler.

The balance of my time was spent (mostly) hand-sanding the interior liner repair and the bilges.

Total Hrs: 2.5