Mid-October through TBD

Project Scope: Bottom job (stripped, barrier coat, and new antifoul), hull and deck paint, structural repairs, new brightwork fabrication, assembly and varnishing, mast and boom paint, new deck hardware, more tbd.

Biscuit.jpg

Project Hours:  

Fairing Aft Deck Repair and Continued Interior Sanding (1-17-25)

Jan 17, 2025

With just a couple hours to work, I got straight to work on the aft deck repair. After removing the peel ply, I lightly sanded the surface and then applied a batch of fairing filler - West System epoxy resin thickened with 406 colloidal silica and 407 low-density fairing filler.

The balance of my time was spent (mostly) hand-sanding the interior liner repair and the bilges.

Total Hrs: 2.5