top of page
< Back

Biscuit

BOAT:

Biscuit, a 1974 Cape Dory Typhoon

Project Detail:

Timeline:

Mid-October through TBD

Project Scope: Hull and deck paint, structural repairs, brightwork assembly and refinishing, other tbd

Biscuit.jpg

Project Hours:  

Fairing Aft Deck Repair and Continued Interior Sanding (1-17-25)

Jan 17, 2025

With just a couple hours to work, I got straight to work on the aft deck repair. After removing the peel ply, I lightly sanded the surface and then applied a batch of fairing filler - West System epoxy resin thickened with 406 colloidal silica and 407 low-density fairing filler.

The balance of my time was spent (mostly) hand-sanding the interior liner repair and the bilges.

Total Hrs: 2.5

Anchor 1
bottom of page