BOAT:

Biscuit, a 1974 Cape Dory Typhoon

Project Detail:

Timeline:

Mid-October through TBD

Project Scope: Bottom job (stripped, barrier coat, and new antifoul), hull and deck paint, structural repairs, new brightwork fabrication, assembly and varnishing, mast and boom paint, new deck hardware, more tbd.

Biscuit.jpg

Project Hours:  

Taping Off the Cockpit Seating Nonskid

Feb 24, 2026

Grabbing a bit of time in the late afternoon, I made my way over to Biscuit to tape off the nonskid areas on the port and starboard cockpit seating. I created a jig with two tick marks on it to serve as reference points to then transpose onto the outer edge of the cockpit seating - four areas, two to each side.

I then taped off the area, following the reference points, and applied a diagonal piece within the inner portion of each corner. I used a quarter for the jig to create the rounded corners, carefully cutting and removing the waste with.a razor.

These nonskid seating section will receive their first coats of nonskid in the coming days.

Total Hrs: 1.5