Somerledi

About Her:  Somerledi is an '84 Shannon 28

Project Scope: Work on Somerledi is to include a complete bottom job, with blister repairs, seacock removal and replacement, and additional items as needed by her owner.

Timeline:  March 2026 through TBD

Project Hours:  

Biscuit.jpg

2nd Bottom Sanding Session

March 21, 2026

Back at the bottom this Saturday morning with intent to finalize the port side of Somerledi. On the first session of bottom removal, I had no mental or physical strength to attack the turn of the bilge, so that was the focus of today. I started towards the bow of Somerledi, at the turn of the bilge and then worked aft. After finishing the grueling overhead, I walked back to the bow and finished the forefoot. Finishing the port side felt like a significant milestone, and with that energy, I returned to the rudder and finished the port side before turning to the starboard side.

The rudder was completed to ~95%, and with the day long in the tooth, I started on the starboard hull, just forward of the prop aperture. I managed to get a good start on the starboard aft before rolling it up for the evening. More to come on the bottom removal (unfortunately).

Total Hrs: 9.5